Free cookie consent management tool by TermsFeed Cookies

300kw on grid solar power system in the Philippines for factory

Jul,08,2022
namkoo solar
  • Project: 300KW grid tie solar power system for factory use
  • Location: Philippines
  • Solved: Reduce high electricity bill

 

Due to the impact of the typhoon, the electricity supply is short, causing the electricity bill to rise. The daily electricity consumption of the factory is very huge, wanted to buy a grid tie solar power system for the factory, so that the customer could stay away from expensive electricity bill.

 

300KW-on-grid-project-in-Philippines-factory

300kw-on-grid-solar-system

 

According to the customer's factory roof area, our structural engineer calculates that 300kw solar panels can be placed. We design use 6 sets on-grid solar system.

 

The 300kw on-grid solar system was successfully produced and shipped. After the customer receives the goods, they installed and used, the effect has been very good. It can save three-quarters of your previous electricity bill every month. Only about four years, the electricity saved is the cost of a system. Our grid tie solar power system can be used for more than 25 years, the clean energy will be used free of charge for the next 20 years.

 

6-sets-50KW-on-grid-solar-system

 

Our professional engineers design a solar power system that meets the customer’s requirement. If you want to know more about this grid tie solar power system, please feel free to contact NAMKOO team. We can design a solar energy solution that matches your requirement.

PROJECTS

咨询