Free cookie consent management tool by TermsFeed Cookies

450kw on grid solar power project for a building materials factory in Manila, Philippines

Apr,24,2023
namkoo solar

450kw on grid solar power project for a building materials factory in Manila, Philippines

450kw

Namkoo New Energy, a leading provider of renewable energy solutions, has been approached by a building materials factory in Manila, Philippines, to design and install a 450kW grid-connected solar power project on their factory rooftop. The factory is located in an industrial area with ample sunlight and a high energy demand, making it an ideal location for a solar power project. Namkoo New Energy has extensive experience in designing and implementing solar power projects and is excited to take on this project.

Project Design:

After conducting a thorough site assessment, Namkoo New Energy designed a 450kW solar power project that consists of 1,500 high-efficiency solar panels mounted on the factory rooftop. The solar panels are connected to 15 grid-tied inverters, which convert the DC power generated by the solar panels into AC power that can be used by the factory or exported to the grid.

solar inverter

solar inverter

The solar power system is designed to generate approximately 600,000 kWh of electricity annually, which is equivalent to the factory's average annual electricity consumption. The solar power system is expected to offset the factory's carbon emissions by approximately 440 tons annually, making it an environmentally friendly and sustainable solution.

Project Implementation:

Namkoo New Energy's team of experienced engineers and technicians will oversee the installation of the solar power system, which is expected to take approximately 3 months to complete. The installation process will involve the following steps:

solar installation

Preparation: The factory rooftop will be prepared by clearing any debris and cleaning the surface to ensure the solar panels can be mounted securely.

Mounting: The solar panels will be mounted on the factory rooftop using specialized racking systems designed to withstand harsh weather conditions.

Wiring: The solar panels will be wired together and connected to the inverters, which will convert the DC power generated by the solar panels into AC power.

Testing: The solar power system will undergo rigorous testing to ensure it is operating at peak efficiency and is connected to the grid.

Commissioning: Once the solar power system has passed all tests, it will be commissioned and connected to the grid, allowing the factory to start using the renewable energy generated by the system.

solar panel

Project Financing:

Namkoo New Energy has partnered with a leading Philippine bank to provide financing for the solar power project. The financing package includes a combination of debt and equity financing, which allows the factory to spread the cost of the solar power project over a 10-year period. The financing package is structured in a way that allows the factory to generate positive cash flows from the solar power system from day one, making it a financially viable solution.

450kw solar on grid

Conclusion:

The 450kW grid-connected solar power project for the building materials factory in Manila, Philippines, is a sustainable and cost-effective solution that will benefit both the factory and the environment. Namkoo New Energy's expertise in renewable energy solutions and partnerships with leading Philippine banks have made it possible for the factory to switch to renewable energy without incurring a significant upfront cost. The solar power system is expected to generate positive cash flows for the factory over the long term, making it a win-win solution for all parties involved.

PROJECTS

咨询